
Infrared Temperature Sensor and Transmitter with 4-20 mA Output - Encased in Stainless Steel Protective Housing with Air Purge and 6 Meters (20ft) Long Leads
Infrared Temperature Sensor and Transmitter with 4-20 mA Output - Encased in Stainless Steel Protective Housing with Air Purge and 6 Meters (20ft) Long Leads Infrared Non Contact temperature measurement capabilities with 4-20 mA output. Temperature Measurement range from – 58°F to 1886°F (-50°C to 1,030°C) Sensor head capable of operating in temperatures from -4 to 248°F (-20 to 120°C) The sensor itself can operate in 10% to 95% relative humidity conditions with ingress protection rating of IP65. The protective housing enhances this performance and has operated in steam and quick freeze applicaitons Protective Housing Size - Stainless Steel cylindrical housing 2.815" (71.5 mm) length with a 0.993" (25.2 mm) Diameter body tapering to 0.827" (21 mm) Infrared Sensor Body Size encased in the housing is 1/2" (.551" or 14 mm) diameter stainless steel cylindrical housing 1.10" (28 mm) length housing. Mounting is accomplished with a M12 x 1 thread. A mounting nut is included. Wire