1. RAND Bookstore
  2. All Books
  3. Another Estimate of Expected Critical Path Length in PERT Networks
Another Estimate of Expected Critical Path Length in PERT Networks
shop.rand.org

Another Estimate of Expected Critical Path Length in PERT Networks

$20.00
{{option.name}}: {{selected_options[option.position]}}
{{value_obj.value}}
Store Logo

RAND Bookstore

View Store

This paper suggests a technique which, while more complex than Fulkerson's, is more accurate, giving estimates which fall between his and the true expected value.

Show More Show Less

Related Collections

  • Dome Network Camera
  • Patch Network Cable
  • Network Optics Cameras
  • Network Cisco Switch
  • Optic Network Camera
  • Length Floor Mirror
  • Thru Axle Length
  • Strap Length Bag
  • Party Dress Length
  • Purse Strap Length
  • Quinceanera Dress Length
  • Sash Ribbon Length
  • Socket Point Length
  • 4-inch Aluminum Length
  • Hex Bit Length 1
  • Veil Length Bridal

More products by RAND Bookstore

Expected Critical Path Lengths in PERT Networks - RAND Bookstore
shop.rand.org
$20.00

Expected Critical Path Lengths in PERT Networks

RAND Bookstore RAND Bookstore
Notes on Combinatorial Mathematics: An Estimate of Expected Critical Path Length in PERT Networks - RAND Bookstore
shop.rand.org
$20.00

Notes on Combinatorial Mathematics: An Estimate of Expected Critical Path Length in PERT Networks

RAND Bookstore RAND Bookstore
A Cost Analysis of Minimum Distance TV Networking for Broadcasting Medical Information. - RAND Bookstore
shop.rand.org
$30.00

A Cost Analysis of Minimum Distance TV Networking for Broadcasting Medical Information.

RAND Bookstore RAND Bookstore
A Comparison of Alternative Methods for Estimating Treatment Effects. - RAND Bookstore
shop.rand.org
$20.00

A Comparison of Alternative Methods for Estimating Treatment Effects.

RAND Bookstore RAND Bookstore
View All